|
The L&T team and representatives of the customer, Saudi Arabian Oil Company, with the 300 MT vessel.
L&T Heavy Engineering marks a momentous despatch from its Saudi Arabian facility The completion of a project is always a cause for jubilation – both for the customer and for the project team. One such success was the despatch of the 300 MT depressurising vessel in May from L&T Hydrocarbon Saudi Integrated Manufacturing Factory, i.e. the Heavy Wall Pressure Vessel facility at Jubail in the Kingdom of Saudi Arabia. The vessel was bound for the Jafurah Gas Compression Project (Phase II). Fabricated by the L&T Heavy Engineering team, the vessel is approximately 7 metres in diameter and nearly 40 metres in length. It is among the largest to have been dispatched since the facility began manufacturing vessels in October 2024. In recognition of this accomplishment, representatives from the customer, Saudi Arabian Oil Company, visited L&T’s facility to commend the exceptional efforts and dedication of the L&T team for their unwavering support, commitment and contribution to this success. The world-class facility undertakes advanced manufacturing. In a short span of time, it has secured Aramco 9COM approvals (6000002522, 6000002523, 6000002524 & 6000002525) and is supporting key projects in the region. Accredited with ASME U, U2, S, R and NB along with ISO 9001 : 2015, 14001, 45001, 29001 certifications, the facility delivers end-to-end capabilities - from design to dispatch. It is equipped with cutting-edge infrastructure to undertake complex fabrication, giving reliable support to the region’s industries. The facility has the capacity to manufacture equipment using a wide range of materials. Importantly, L&T’s facility focuses strongly on the development of local talent, equipping Saudi Arabia’s Gen-Z with the skills required to participate in boosting the economy and take the people of the Kingdom to even greater heights of prosperity. A definite win-win!
|